What an asbestos inspection is

Last updated

A plain-English explanation of a thorough asbestos inspection before renovation or demolition, based on EPA’s asbestos NESHAP and how states use accredited inspectors.

An asbestos inspection is a survey of a building, or of the part that will be worked on, to find materials that contain asbestos before anyone cuts, drills, scrapes, or tears them out. It is not a medical exam, and it is not a permit by itself. The federal rule that makes the survey matter for many demolitions and renovations is the asbestos National Emission Standard for Hazardous Air Pollutants, in 40 CFR Part 61, Subpart M. EPA’s overview of that standard says the regulations require a thorough inspection where the demolition or renovation operation will occur.

You generally cannot tell that a material contains asbestos by looking at it, unless it is labeled. EPA’s page on protecting your family says that if you are in doubt, treat the material as if it contains asbestos and leave it alone. The same page says a trained and accredited professional should take samples, because sampling done incorrectly can release fibers, and that taking samples yourself is not recommended.

A thorough inspection looks at both friable material and nonfriable material. Friable material can be crushed to powder by hand pressure. Nonfriable material, such as some floor tile, roofing, or cement board, can still become regulated if it is sanded, ground, cut, or otherwise broken up. The inspector’s job is to identify suspect materials in the area that the project will disturb, decide what to sample, and record locations and amounts. The laboratory report comes back later. The inspection is not finished when someone glances at a popcorn ceiling and says it “looks old.”

Who may do the survey depends on the state. Some environmental agencies certify inspectors themselves. Arkansas’ air program, for example, requires an inspector certified in Arkansas before covered renovation or demolition. Montana requires a Montana-accredited inspector regardless of the building’s age, and the report must be on site. North Carolina’s health department requires an accredited professional before demolition or renovation. Wyoming’s environmental agency says the state does not license inspectors at all, but a trained inspector is still required for public and commercial buildings and should show a current training certificate. California splits the world differently: air districts handle the demolition notice, while Cal/OSHA certifies consultants and technicians who sample or oversee larger removal jobs. The point is to ask the state program which credential the inspector must hold, using the contacts on EPA’s state asbestos list.

The written report is what you hand to contractors and, often, to the agency that receives the notice. It should say what was inspected, what was sampled, what the lab found, and roughly how much material is there. New Mexico’s air bureau says a demolition notice must include a survey by a qualified professional and that the survey must be within three years of the start of removal. Other states set their own timing. Do not assume a survey from a previous owner is still the one the agency will accept.

An inspection is also the document that tells you whether a notice is required. EPA’s overview explains that notification applies to demolitions and to renovations over a threshold amount of regulated asbestos-containing material. Many states still want a demolition notice even when the inspection finds no asbestos. Alabama, Arkansas, North Dakota, and Vermont are examples that say so on their own pages. The inspection is what makes that “none found” statement defensible.

If the building is a school, a different federal rule applies on top of any renovation survey. The Asbestos Hazard Emergency Response Act page describes inspections and management plans for public and nonprofit private schools. That school inspection is about managing material in place. A pre-demolition survey is about what the construction project will disturb. A school can need both.

Hire the inspector before you sign a demolition contract and before anyone starts “exploratory” demolition. Once material is on the ground, the chance to sample it in place is gone. Ask the inspector which state’s credential they hold, whether they will also bid on the removal (a conflict some states warn about), and when you will receive the report and the lab sheets. Then use that report to decide whether you need a licensed abatement contractor and which agency must be notified. The inspection does not authorize removal by itself.

Sources

  1. EPA overview of the asbestos NESHAP
  2. 40 CFR 61.145 demolition and renovation standard
  3. EPA, Protect your family from asbestos
  4. EPA state asbestos contacts

Free checklist

Before You Renovate

A one-page list of questions to ask the agency and the contractor before demolition or renovation disturbs building materials.

Free. We email you the download link, plus an occasional plain-English guide. Unsubscribe any time. We never sell your email. Privacy