What to ask before a renovation

Last updated

Questions for owners, contractors, and agencies before a renovation or demolition disturbs building materials that might contain asbestos.

The useful questions come before the first cut, not after dust is on the floor. Start with the building. Is it a house with four or fewer units, a larger apartment building, a school, or a commercial or public building? EPA’s NESHAP overview draws lines around residential buildings with four or fewer dwellings and still regulates institutional, commercial, and industrial buildings, with exceptions when houses are part of a bigger project or will be burned. Utah adds a date: some small residences built on or after January 1, 1992, are treated differently from NESHAP facilities, and older houses are not in that sentence. Kentucky says state law does not regulate removal from single-family homes or apartments of four or fewer units, which is not the same as saying a commercial job is exempt. Write down which description fits, then ask the state contact on EPA’s list if you are unsure.

Ask whether an inspection is required and who may do it. The federal standard requires a thorough inspection where demolition or renovation will occur. States add credentials. North Carolina wants an accredited inspector before demolition or renovation. Montana wants a Montana-accredited inspector no matter how old the building is, and the report stays on site. Washington wants an AHERA building inspector’s good-faith survey before work that could disturb suspect material, at any building age, and posts a daily penalty if it is skipped. Wyoming does not license inspectors and still expects a trained one for public and commercial work, with a current training certificate. EPA’s family page says not to take samples yourself.

Ask what the report must contain and how recent it must be. New Mexico wants the survey within three years of the start of removal and attached to a demolition notice. A survey that covered only the lobby does not cover a wing you added to the contract later. If the scope grows, ask whether the inspector has to come back.

Ask whether a notice is required even if the report says no asbestos. Alabama, Arkansas, North Dakota, Vermont, and North Carolina each say, in their own words, that demolition is notified with or without asbestos. Tennessee’s form has a yes/no asbestos box and still says to send it 10 working days ahead. Ohio wants ten working days for covered work and a next-working-day notice for true emergencies, not for a late schedule. Ask which agency receives it. In California and parts of Washington and Pennsylvania, the county changes the address. Idaho splits major facilities from everyone else. A building permit does not answer this.

Ask who must be licensed for the removal, and check that license with the agency, not with the bidder. Georgia, Connecticut, New Jersey, Texas, Nebraska, and California each publish a different kind of credential. Mississippi says to verify the certificate on the state’s list. If the state says it does not license inspectors, do not pay extra for a fake card. Ask for the competent person required by OSHA’s construction standard and which class of work this job is.

Ask where the waste will go and who may haul it. Maine licenses transporters for friable waste. Maryland permits the landfills. Oregon lists facilities that accept asbestos waste. A price that excludes disposal is not a complete price.

If the building is a school, ask for the management plan and whether the state is one of the twelve AHERA waiver states named on EPA’s contact page. A renovation of a school can need the plan, an inspection of the work area, and a NESHAP notice. Ask who the designated person is.

Ask what happens if the start date moves or more asbestos is found. Ohio’s rule treats a twenty percent change in amount as an updated notice. Tennessee wants start-date changes before the work. Do not let a crew “just start” while a revision is in someone’s inbox.

Finally, ask for the paper you will keep: the inspection report, the lab results, the license or accreditation numbers, the notice and its confirmation, and the waste shipment record. Those documents are how you show an inspector, a buyer, or a lender what was done. They are also how you notice that a step was skipped while there is still time to file it. The questions are ordinary. The time to ask them is before the renovation starts.

Sources

  1. EPA, Protect your family from asbestos
  2. EPA asbestos NESHAP overview
  3. 40 CFR 61.145
  4. EPA state asbestos contacts
  5. OSHA 29 CFR 1926.1101

Free checklist

Before You Renovate

A one-page list of questions to ask the agency and the contractor before demolition or renovation disturbs building materials.

Free. We email you the download link, plus an occasional plain-English guide. Unsubscribe any time. We never sell your email. Privacy